What is the difference between circular rail speed and tempo? How to confirm when selecting?The speed and cycle time of the circular guide are not the same concept. Speed refers to the movement parameters of the equipment during a certain period of operation; cycle time refers to the total time required for a product or a set of tooling to complete a cycle. No matter how high the maximum speed of the equipment is, if positioning, process stops, loading and unloading, or work station coordination are not handled well, the actual production capacity may not necessarily increase.
Therefore, when selecting a circular guide rail, you should not just ask "how fast it can run", but also first clarify how long each action takes in a complete cycle.
Speed is usually used to describe how fast the slide or tooling runs on the guide rail; the cycle time includes the entire time from the beginning of one cycle to the beginning of the next repetition.
A loop often includes:
1. The tooling moves from the previous station to the next station;
2. Acceleration, deceleration and positioning;
3. Process stops such as assembly, testing, press-fitting, and visual recognition;
4. Manual or automatic loading and unloading;
5. Backhaul, buffer, or wait for adjacent stations to complete.
Therefore, tempo is only one factor in the cycle time. Increasing the running speed can only shorten the movement time, but cannot replace the process action itself.
In multi-station cyclic conveying, the actual cycle time is usually determined by the station that takes the longest. If a certain station requires longer assembly or inspection time, other stations may have to wait even if they run faster.
In addition, acceleration and deceleration, positioning stability and tooling stress must also be considered when starting and stopping frequently. Blindly increasing the speed in order to shorten the running time may increase the shaking of the tooling, positioning adjustment or debugging difficulty, and ultimately may not shorten the overall cycle.
A more reasonable approach is to first identify the bottleneck station in the process, and then confirm whether it is necessary to add parallel stations, adjust the slide circulation method, or arrange buffering in the return section.
For projects that frequently start and stop, it is recommended to provide the following information together:
1. Single running distance and route form;
2. Residence time at each workstation;
3. The weight, shape and center of gravity of the tooling and products;
4. Whether repeated positioning, detection or robot picking and placing is required;
5. Whether parallel operations can be performed between workstations;
6. Whether there are dynamic working conditions such as pressing, jacking, and visual photography;
7. Requirements for noise, vibration, maintenance and safety protection.
This information is used to determine the operating curve, slide spacing, number of work stations and driving mode. Before the working conditions are clear, it is not recommended to directly use a single maximum speed as the selection conclusion.
Multi-station equipment should first list loading, assembly, testing, unloading and other actions in process order, and then compare the occupied time of each station. Stations with similar process times are more likely to form a stable cycle; stations with larger differences need to be balanced through parallel operations, buffering or adjustment of the number of slides.
For example, when a certain station requires a longer inspection time, you can evaluate whether to allow other stations to operate at the same time, or whether to allow the tooling to continue circulating at subsequent positions. The specific method should be confirmed in combination with layout, tooling and control logic.
Elliptical, rectangular or arc paths also affect the actual cycle time. In addition to the length of the guide rails, space for tooling turning envelope, loading and unloading, testing equipment and return should also be reserved during layout. For the relationship between the number of workstations and carriages, please refer to"How many work stations are suitable for elliptical ring guide rails?" How to determine the number of carriages? 》。
If you need to confirm the tempo and cycle time, it is recommended to prepare the following information:
1. Target production capacity or single piece completion time;
2. Process flow and action time of each station;
3. Size, weight and center of gravity of tooling and products;
4. Number of workstations, layout or available installation space;
5. Positioning, detection, loading and unloading and safety requirements;
6. Whether it needs continuous operation, frequent start and stop, or linkage with other equipment.
Only by providing this information can we judge the route, number of slides, driving method and control rhythm based on the actual process.
The speed of the circular guide is an operating parameter, and the cycle time is the result of the entire process cycle. When selecting, the running distance, acceleration and deceleration, positioning, process stop, loading and unloading and work station coordination should be calculated together instead of just comparing the maximum speed.
When the project is in the planning stage, you can first useRing guide rail online selection systemAfter completing the preliminary screening; after entering into equipment design, it is recommended to provide process cycle time sheets, layout drawings and tooling information, which will be confirmed by technicians based on actual working conditions.
Related reading:
Ring guide rail online selection system
How to choose circular guide rail? Load, cycle, layout and driver confirmation checklist
Precision conveying systems · Products and service
Products
Chain-driven ring guidesBelt-driven ring guidesPrecision link conveyorsCurved and linear guide componentsMagnetic levitation conveyorsCam-link ring guidesAbout us
Company profileOur facilitiesCertifications VideosApplicationsApplications
Automotive & new energy Precision electronics assembly Consumer electronicsMedical devicesNew energyPrecision dispensingNews
Company news Industry news NewsContact us
Contact details
WhatsApp Business
Contact details+86 18912659251
Links: