How do load, speed, cycle time and number of carriages affect the selection of ring guides?When selecting annular guide rails, load, speed, cycle time and number of slides often appear together, but they are not four parameters that can be determined separately.
For example, after the load increases, the driving margin, slide force, and tooling center of gravity all need to be rechecked; after the cycle time increases, the running speed cannot only be increased, but also whether the acceleration, deceleration, dwell, positioning, and process waiting are matched. As the number of slides increases, the work station layout, tool spacing and return space will also change accordingly.
Therefore, when selecting, the actual process should be sorted out first, and then the guide rail route and drive scheme should be determined.
When confirming the load, you should not only provide "how many kilograms of the product", but also include the weight of all the following parts on the tooling, fixtures, jigs and slides.
It is important to check the following contents:
For the same total weight, if the position of the center of gravity is different, the stress on the guide rail and carriages will also be different. When the tooling is large or the center of gravity is extended, it is recommended to provide tooling drawings or dimensions during the planning stage, and have technicians confirm the slide configuration and installation method.
Speed is a parameter during the operation of the guide rail, and cycle time is the total time required for the product to complete a cycle or enter the next station.
The actual cycle time of a workstation usually consists of the following parts:
Therefore, simply increasing the speed may not necessarily shorten the actual production cycle. Especially in projects with frequent starts and stops and high positioning requirements, the operating curve, driving method and positioning scheme are often more important than the maximum speed.
If the project cycle is high, it is recommended to clarify the output per minute, single movement distance, dwell time and daily running time, rather than just stating "hope the sooner the better".
The number of slides is usually related to the number of workstations, product spacing and process flow.
For example, in multi-station cyclic conveying, each slide may correspond to a set of tooling, or there may be a situation where one station continuously processes multiple slides. After the number of slides is increased, it needs to be confirmed simultaneously:
The more slides, the better. Insufficient quantity will affect workstation connection, while excessive quantity may increase the complexity of layout, control and maintenance. It should be initially calculated based on the process cycle and the number of workstations, and then confirmed based on the on-site space.
In actual projects, preliminary judgments can be made by dividing them into several categories according to working conditions.
For this type of project, it is recommended to first confirm the load of the single slide, the center of gravity of the tooling, the guide rail route and the installation space. Don't just reserve according to the center size of the guide rail, but also calculate the maximum envelope range of the tooling during operation.
In addition to confirming the speed, this type of project must also focus on checking acceleration and deceleration, positioning method, drive mode and continuous running time. Smooth operation and reliable positioning are usually more important than simply pursuing the highest speed.
For such projects, the process time of each station should be sorted out first, and then the number and spacing of slides should be determined. It is necessary to consider the tooling size, loading and unloading position, inspection station and return area at the same time.
For non-standard routes such as ellipses, rectangles, circles, and arc splicing, the site plan, equipment interfaces, and surrounding interference information should also be provided. Sites with high temperatures, dust, humidity, or cleaning requirements also need to be explained in advance.
In order to improve the efficiency of plan confirmation, it is recommended to prepare the following information when communicating:
The more complete the information, the easier it is to eliminate routing, load or installation interference problems in the early stage, and reduce subsequent drawing changes and debugging work.
The selection of circular guide rails cannot only depend on one of the load, speed or guide rail size. The load determines the force base, the speed and cycle time determine the operation requirements, and the number of slides affects the workstation arrangement and overall circulation method.
It is recommended to sort out the product circulation path, tooling size, number of workstations and target cycle time according to the process, and then confirm the guide rail route, driving mode, slide configuration and positioning plan based on the actual layout.
If the project is still in the planning stage, you can first enter the ring guide online selection system for preliminary screening. After entering into equipment design, it is recommended to provide layout diagram, load, cycle time and tooling information, and technicians will confirm the plan according to actual working conditions.
Related content
Ring guide rail online selection system
How to choose circular guide rail? Load, cycle, layout and driver confirmation checklist
How to choose between chain type and belt type ring guide rails? Load vs. cycle time
Precision conveying systems · Products and service
Products
Chain-driven ring guidesBelt-driven ring guidesPrecision link conveyorsCurved and linear guide componentsMagnetic levitation conveyorsCam-link ring guidesAbout us
Company profileOur facilitiesCertifications VideosApplicationsApplications
Automotive & new energy Precision electronics assembly Consumer electronicsMedical devicesNew energyPrecision dispensingNews
Company news Industry news NewsContact us
Contact details
WhatsApp Business
Contact details+86 18912659251
Links: